Complaint Regarding Outdated Train Timings and Excessive Travel Time Despite Double-Line Railway Track
Train Details
Complaint Details
Complaint Text
Complaint Regarding Outdated Train Timings and Excessive Travel Time Despite Double-Line Railway Track
Complaint Description
Respected Sir/Madam, I would like to bring to your attention the unnecessarily long travel time and outdated train schedules on this railway route. The current train timings appear to have been designed when the railway track was a single line. However, the track has now been converted into a double line, but there has been no significant improvement in train timings or reduction in travel duration. It is disappointing that trains are still taking approximately 1 hour to cover a distance of just 30 kilometres. At a time when Indian Railways is continuously upgrading its infrastructure and improving train speeds across the country, such a slow journey raises serious concerns about the utilization of the upgraded railway infrastructure. I would like to request the concerned railway authorities to: Review the existing train schedules and running times on this route. Conduct a speed and operational efficiency assessment of trains operating on this section. Reduce unnecessary waiting time, stoppages, and operational delays wherever possible. Revise the train timetable according to the current double-line infrastructure and permissible speed limits. Ensure that trains cover the distance within a reasonable and technically achievable travel time. The purpose of upgrading railway infrastructure should be to provide passengers with faster, more efficient, and convenient transportation. Simply converting a single line into a double line without improving train timings does not provide the full benefit of the investment. I sincerely request the railway authorities to investigate this matter and take appropriate action to improve train speeds and reduce travel time on this route. Passengers deserve better connectivity, better speed, and better utilization of railway infrastructure. Thank you.
Comments